WELGER • V 160
67
10.9 Lubrication
chart
after each 250 bales (or daily)
Item in
(Figure 76)
Machine part
Lubricant (
Table 2
)
Note
4
Manual roller lubrication (lubricant metering
device)
A
1)
Left machine side
after each 500 bales (or daily)
Item in
(Figure 76)
Machine part
Lubricant (
Table 2
)
Note
1 Drive
shaft
A
2
Autom. chain lubrication system
B
Right machine side (Figure 73)
see 10.7 Chain lubrication
5
Locking hook
A
on both sides
6
Roller on locking device
A
on both sides
7
Conveying rotor
A
on both sides
16
Belt tensioning rocker arm
d
on slotted hole of hydraulic cylinder
1)
Supply metering device by means of 2 strokes from the manual grease gun - do not use compressed air grease gun.
Annually after the end of the season (in case of special operating conditions also weekly)
Item in
(Figure 76)
Machine part
Lubricant
(
Table 2
)
Note
3
Hinge of tail gate
A
10
Main gear unit
C / 1.7 l
Oil change
Check filling level with dip stick or
overflow hole
11
Movable parts of the net tying unit* or
movable parts of the twine tying unit*
d
provide for smooth motion
12 Hydraulic
cylinder
on tail gate locking mechanism
A
on both sides
13
Star ratchet in pick-up drive
A
Left machine side
14
Twine eyes
A
grease chafe marks slightly
15
Belt tensioning rocker arm
d
at the connection points of springs
and belt tensioning rocker arm
Summary of Contents for V 160
Page 1: ...LELY WELGER V 160 V 160 1758 99 03 01 02 08 Operating Manual...
Page 2: ......
Page 34: ...26 WELGER V 160 4 1 1 Drawbar head positions all measures in mm Figure 10...
Page 78: ......
Page 80: ......