47
Overload protection components
Overload control has been set to the correct values at the factory and it is
strictly forbidden to change its settings. THERE IS A RISK OF THE ACCESS
PLATFORM TIPPING OVER!
Overload control mechanism is located between the working platform and the platform
support (Figure 25). Basket load is measured with a load sensor (1) which follows EN 280 -
standard.
Figure 25: Load cell unit MOBA MRW in the platform
Maximum platform load has been adjusted to 250 kg.
In an overload situation the use of booms is prevented, and you will hear a sound alarm and see
a red indicator light in the lower (Figure 7 (4)) and upper control (Figure 7 (10)) panels.
-
Remove excess load from the platform.
-
Both alarms will go OFF.
-
Use of booms is possible again after removing the load from the platform.
The load sensor should be checked regularly for physical damage. Damage might cause
incorrect sensor values. If the sensor must be replaced due to faults or damage, the bolts
should be tightened to 150 Nm.
NEVER OVERLOAD THE MACHINE!
Summary of Contents for 135 NEO
Page 1: ...Operator and Service manual Version 7 2020 July 2020 ...
Page 9: ...9 Main dimensions Figure 2 135 NEO Main dimensions side Figure 3 135 NEO main dimensions rear ...
Page 10: ...10 Reach diagram and support dimensions Figure 4 Reach diagram Figure 5 Support dimensions ...
Page 59: ...59 Figure 37 Load control of the platform Figure 38 Boom position monitoring ...
Page 60: ...60 Figure 39 Platform levelling monitoring Figure 40 Outrigger monitoring ...
Page 61: ...61 Figure 41 Transport position monitoring Figure 42 Prevention of drive function ...
Page 64: ...64 Figure 47 Platform load monitoring override Figure 48 Override of Safety Functions ...