REPAIR INSTRUCTIONS
Welding
All load-carrying steel parts are manufactured from S420MC EN10149 sheet and
S420MH/S355J2H EN10219 tubular pipe.
Welding repairs may only be carried out by professional welders. When welding, use only
methods and additives suited for the abovementioned steel qualities.
SFS EN-ISO 5817 quality level D is suitable for all welding, except for load-bearing parts.
Load-
bearing structures may only be welded with consent from the manufacturer. If you are at all
uncertain about whether the damage can be repaired by welding, contact the manufacturer.
Before welding
:
-
Remove and cover the plus (+) and minus (-) terminals of the battery.
-
Disconnect all contacts of the logic controllers (Figure 33). Connect the earth terminal of the
welding device directly to the part to be welded.
-
Do not touch the controller or electric cables with the welding electrode or the earth terminal
of the welding device.
ATTENTION! It is not allowed to change the construction and structure of
this access platform without a written permission from the manufacturer.
Figure 32 Logic controller
Note! The structure of this access platform may not be altered without
written permission from the manufacturer.
Summary of Contents for 135 NEO
Page 1: ...Operator and Service manual Version 7 2020 July 2020 ...
Page 9: ...9 Main dimensions Figure 2 135 NEO Main dimensions side Figure 3 135 NEO main dimensions rear ...
Page 10: ...10 Reach diagram and support dimensions Figure 4 Reach diagram Figure 5 Support dimensions ...
Page 59: ...59 Figure 37 Load control of the platform Figure 38 Boom position monitoring ...
Page 60: ...60 Figure 39 Platform levelling monitoring Figure 40 Outrigger monitoring ...
Page 61: ...61 Figure 41 Transport position monitoring Figure 42 Prevention of drive function ...
Page 64: ...64 Figure 47 Platform load monitoring override Figure 48 Override of Safety Functions ...