Please add three-pole (3-pole) MCCB to
distribution panel
for UPS’s input. Do not
connect any other load to it.
Connect the phase cables to
X1 MAINS SUPPLY:
X1/L1 - X1/L2 - X1/L3
terminals, the neutral to
X1 MAINS SUPPLY:
X1
/
N
terminal. Neutral
connection should be done directly from
distribution neutral bus to UPS neutral.
5.3.1.3. Auxiliary Supply Connection
Electrical Characteristics - Bypass
Model (kVA)
10
15
20
30
40
60
Bypass frequency slew rate
2 Hz/s settable from 1 to 3 Hz/s
Bypass rated voltage
Nominal output voltage ±18% (settable)
Bypass rated frequency
50/60 Hz (selectable)
Bypass frequency tolerance
±3Hz
Table.5
If auxiliary supply exists, remove all bridges.
When used, the residual current earth leakage
protection system must be common for the two AC inputs and installed upstream.
According to EN 62040-1, the user should place a warning label on the input distribution panel and the
other primary power isolators, in order to prevent the risk of voltage backfeed.
This label is sent with the Installation Manual. It indicates:
RISK OF VOLTAGE BACKFEED
•
Isolate Uninterruptable Power Supply before working on this circuit.
•
Then check for Hazardous Voltage between all terminals including the protective earth (PE).
Summary of Contents for 30 KVA
Page 1: ...KEOR T 10 60 KVA INSTALLATION MANUAL ...
Page 4: ...IV Installation Operating Manuals Battery Fast Fuses ...
Page 30: ...25 KEOR T 10 30kVA 1x60pcs 7 9Ah BATTERY WIRING DIAGRAM Figure 5 3 1 4 1 ...
Page 31: ...26 KEOR T 10 30kVA 2x60pcs 7 9Ah BATTERY WIRING DIAGRAM Figure 5 3 1 4 2 ...
Page 32: ...27 KEOR T 40 60kVA 2x60pcs 7 9Ah BATTERY WIRING DIAGRAM Figure 5 3 1 4 3 ...
Page 33: ...28 KEOR T 40 60kVA 3x60pcs 7 9Ah BATTERY WIRING DIAGRAM Figure 5 3 1 4 4 ...
Page 46: ...41 Appendix 3 Description of UPS and Block Diagram SEPARATED RECTIFIER AND BYPASS INPUTS ...