54A0059_V1.1_EN / LeddarSteer DBSD Evaluation Board
–
User Guide
39 | 50
11. Optical Setup Examples
11.1. DBSD Calibration
11.1.1. First 7 Cells
Voltage calibration is a step that requires a setup with multiple tools and measurements. Below is the
suggested setup, which is also the one currently being used at LeddarTech. Note that the 300 mm distance
from the DBSD to the screen was selected so as to provide enough space in between each tile. A shorter or
longer distance can be selected.
Fig. 24
: LeddarTech’s current optical setup for calibrat
ing the first 7 cells (conceptual view)
Table 24: Optical setup legend, first 7 cells
#
Tool
Model Used
A
Optical table
Thorlabs
B
Mirrors
Thorlabs PF10-03-P01
C
Collimating lens
Thorlabs C230TMD-B
D
Light source
Thorlabs M9-915-0300, 915 nm, 300 mW
E
Screen
Simple black wall
F
Light source control Thorlabs LDM90 + T LDC205C
G
DBSD
LeddarSteer
H
Vertical polarizer
Thorlabs LPVIS050-MP2
I
DBSD controller
LeddarSteer Evaluation Board
J
Infrared camera
Teledyne FLIR Chameleon3 CM3-U3-31S4M-CS: 3.2 MP with a Kowa
LMVZ4411 lens