UL File# MH19366
7
Unpacking
Receiving the Oven
Upon receipt, check for freight damage, both visible and concealed. Visible
damage should be noted on the freight bill at the time of delivery and
signed by the carrier's agent. Concealed loss or damage means loss or
damage, which does not become apparent until the merchandise has been
unpacked. If concealed loss or damage is discovered upon unpacking,
make a written request for inspection by the carrier's agent within 15 days
of delivery. All packing material should be kept for inspection.
Do not
return damaged merchandise to Star Manufacturing Company. File
your claim with the carrier.
Location
Prior to un-crating, move the oven as near to its intended location as
practical. The crating will help protect the unit from the physical damage
normally associated with moving it through hallways and doorways.
Un-crating
The oven will arrive completely assembled inside a wood frame and
strapped to a skid.
Cut the straps and remove the wood frame.
CAUTION
THE OVEN WEIGHS 500 LBS. FOR SAFE HANDLING, INSTALLER
SHOULD OBTAIN HELP AS NEEDED, OR EMPLOY APPROPRIATE
MATERIALS HANDLING EQUIPMENT (SUCH AS A FORKLIFT, DOLLY, OR
PALLET JACK) TO REMOVE THE UNIT FROM THE SKID AND MOVE IT TO
THE PLACE OF INSTALLATION.
CAUTION
ANY STAND, COUNTER OR OTHER DEVICE ON WHICH THE OVEN WILL
BE LOCATED MUST BE DESIGNED TO SUPPORT THE WEIGHT OF THE
OVEN.
CAUTION
SHIPPING STRAPS ARE UNDER TENSION AND CAN SNAP BACK WHEN
CUT.
Remove oven from skid and place in intended location.