background image

ASSEMBLING YOUR L&L EASY-FIRE KILN

easy-fire-install.pdf 

3/1/2007 Rev 1.3 

Page 1

 

2007  

 

L&L Kiln Mfg, Inc.  505 Sharptown Rd, Swedesboro NJ 08085  P:856.294.0077  F:856.294.0070  [email protected]   hotkilns.com 

  

CAUTION:

  There  is  a  great  deal  of  tension 

created  by  the  torsion  spring .  Use  extreme 
caution when installing it . 

Wear safety goggles . 

Use  the  special  tool  provided  as  directed .  The 
use  of  a  tool  that  does  not  grab  the  end  of  the 
spring  to  allow  you  to  control  it  may  result  in 
serious  bodily  injury .  Call  L&L  if  you  do  not 
have this tool . We will provide it at cost for an 
old kiln .

9) Next you are going to attach the other end of the 
spring in through the slot on the right hand side of the 
ring hinge piece (on the right side as you stand behind 
the  kiln) .  This  will  require  two  people .  Have  one 
person raise the lid into the upright position and hold 
it there while the second person places the slotted end 
of the spring tool through the top of the large hinge 
piece and onto the spring .  

10) Push the spring down as far as you can .  

11) Continue to hold the lid upright .

12)  Insert  the  hinge  tool  down  into  the  body  of  the 
hinge as shown and grab the spring with the notched 
end . Using the hinge bar as a fulcrum push the end of 
the spring into the first slot .  

Put the hinge tool into the body of the hinge:

Top view:

You can also push the spring into place from the 
back through the provided hole if you have room 
to work behind the kiln.

ASSEMBLING YOUR L&L EASY-FIRE KILN

Summary of Contents for EASY-FIRE e18S

Page 1: ...mplete as we can make it which means that there is more than most people will need to read or think about Each heading is self contained for instance Assembling the Stand Most people will be able to figure out how to assemble their stand by looking at it so only read this heading if you get stuck First of all be comfortable with where you are putting your new kiln If you have any questions about t...

Page 2: ...e banding around the kiln box and remove the top 3 You are looking at the heavy duty top of the kiln stand Remove it and set it off to the side Below is the first thing you will see when you open the box the top of the stand Unpack Instructions Vent and Furniture Kit 1 Remove the corrugated pad from the inside of the carton 2 For all kilns you will find the following items a spring hinge tool b in...

Page 3: ...h 1 2 1 2 4 6 and 8 square posts d five pounds of Cone 10 kiln wash e dark viewing glasses d a pair of temperature resistant gloves For an e23T a two 21 full round shelves b four 21 half shelves c six each 1 2 1 2 4 6 and 8 square posts d five pounds of Cone 10 kiln wash e dark viewing glasses d a pair of temperature resistant gloves For an e23T 3 a two 20 full round shelf b four 20 half shelves c...

Page 4: ...floor will be on top remove it now If you ordered a two section kiln the floor of the kiln will not be on the top it will be on the bottom of the kiln as it is part of the spring hinge mechanism which is assembled but not engaged for shipping 5 Notice that the spring on your spring hinge is not engaged ASSEMBLING THE STAND Next using the stand hardware and vent system hardware assemble the vent sy...

Page 5: ...the flexible duct onto the Bypass Collection Box of the Vent Sure Vent System 4 Fit the rubber plastic feet over the bottom of the legs The stand is now fully assembled The fully assembled stand REMOVING THE LID The next step is to remove the lid from the kiln Remove the cotter pin then the hinge pin pull the bar out and remove the spring Set them aside Remove the lid from the kiln The hinge is sh...

Page 6: ...ant to lift the two section kilns up by the handle on the floor slab because the hinge is attached to the floor slab in the back of the kiln You will damage the floor slab if you do not follow this procedure Go to step 10 on page 13 REMOVING THE HINGE 1 Loosen the screws of the large hinge piece that holds the three rings together or the two rings and bottom DO NOT REMOVE SCREWS The teardrop holes...

Page 7: ...ds are given 1 Remove the two screws that hold the outer portion of the control panel to the element terminal box Removing the two screws that hold the control panel on 2 Hinge the dynatrol portion of the control panel down exposing the wire connection terminals The Control Panel Hinged down 3 Remove the wires numbered 1 through 6 from the left side of the Power Terminal Strip and the right side o...

Page 8: ...the box from underneath Pushing the wires through the holes 6 Now skip to the the section called LOCATING THE KILN REMOVING THE CONTROL PANEL This is method number two 1 Remove the two screws that hold the outer portion of the control panel to the element terminal box Removing the two screws that hold the control panel on 2 Hinge the dynatrol portion of the control panel down exposing the wire con...

Page 9: ... control panel halfway back to its original position and gently pull the panel from the element box and set aside It will take a combination of pulling slightly up and slightly out to disengage the control panel from the element terminal box Removing the panel REMOVING ELEMENT COVER BOX If you prefer you can remove the box using the method shown on page 7 instead 1 Remove the three screws on the r...

Page 10: ...m the kiln sections Removing the Terminal Box form the kiln 6 You are now ready to set up the kiln LOCATING THE KILN 1 Place the stand on the floor in the desired location This should be set so that the outside stainless steel surface of the kiln will be at least 12 to 18 from any combustible wall Floor must be nonflammable Information concerning clearances ventila tion and electrical requirements...

Page 11: ...al shims under the legs to ac complish the leveling We suggest using a carpenter s level for this job Make sure that the base will not wobble WHY IS LEVELING SO IMPORTANT If the stand and the bottom are not level your kiln shelves will not be level and loading will be difficult Kiln shelves loaded with ceramic ware are like a house of cards to begin with don t make it any harder Also an uneven flo...

Page 12: ...E HINGE 1 Notice that on the back of the kiln that the mounting screws for the hinge line up 2 Take the large ring hinge piece and drop it onto the screws on the kiln sections If the screws on the kiln don t perfectly line up with the holes in the large hinge piece gently maneuver the hinge piece until you have all the screw heads into the keyhole slots on the large hinge piece Let the piece drop ...

Page 13: ...end of the spring is in the hole to the left of the hinge piece as your looking at it 6 Place the hinge bar through the large hinge piece through the spring and out the other end of the large hinge piece Insert the cotter pins into the holes in each end of the hinge bar It is critical that the hinge bar sits in the bottom of the slot This allows the lid to raise and lower as the kiln body expands ...

Page 14: ...he spring in through the slot on the right hand side of the ring hinge piece on the right side as you stand behind the kiln This will require two people Have one person raise the lid into the upright position and hold it there while the second person places the slotted end of the spring tool through the top of the large hinge piece and onto the spring 10 Push the spring down as far as you can 11 C...

Page 15: ... and be sure to use the special tool provided 13 The hinge is now operational 14 Raise and lower the hinge a few times 15 Double check to make sure that each end of the spring is through the appropriate hole in the ring hinge piece 16 Open the lid to the full open position and insert the safety pin to keep the lid locked in the up position 17 You are now ready to reassemble the panel onto the kiln...

Page 16: ...d the panel separate from the element cover box 1 Take the element terminal box and place it on the screws on the left hand side of the element connection terminals facing from the front 2 Gently push the right side of the element cover box open enough to allow access to feed the element and thermocouple connection wires through the same holes that you previously removed them from 3 Take the 3 scr...

Page 17: ...ug from the control box to the element cover box 3 Reattach all power wires to the appropriate numbered terminals 4 Reattach the thermocouple wires to the appropriate numbered terminals making sure yellow goes with yellow and red goes to red Make sure to push the slip on terminals all the way onto the tabs on the con nection terminals 5 Raise the panel and replace the two screws at the top and tig...

Reviews:

Related manuals for EASY-FIRE e18S