2. Setup
13
2.
S
et
up
CO2 Laser Machine © 2018 Laguna Tools 8/27/2018
EN
2.4 Machine Set-Up
The following sections should be followed exactly in order to properly set-up the
machine.
Removing Zip Ties and Shipping Devices
DANGER!
Make sure that the machine is not connected to the power source during laser tube installation.
WARNING!
Do not plug in machine or connect anything to a power source until prompted to do so.
NOTICE!
Use caution when removing zip ties to avoid damaging the belts..
NOTICE!
Use extreme caution when handling the laser tube as it is fragile.
Figure C027: Removing Zip Ties and Shipping Devices. (1)
Remove packaging zip ties with
scissors.
(2)
Remove belt zip ties with scissors.
The machine is shipped such that nothing can move in transit. Use a pair of
scissors to remove all zip ties as described in C027. Avoid using a razor blade or
knife when remove the zip ties on belts to avoid damaging the belts.
Tools Needed:
Scissors.
Leveling the Machine
Leveling the machine is important to ensure the flatness of the work area and the
alignment of the laser mirrors. Make certain to position the laser machine on a flat
solid surface and level the machine by adjusting each caster. Perform this step prior
to installing the laser tube to reduce the risk of breaking the laser tube.
Installing Panels and Laser Tube Cover
Note: Although only the MX machine is shown, this section is similar for all Laguna
laser machines.
Figure C031: Installing Panels and Laser Tube Cover. (1)
Laser Tube Cover.
(2)
Right side
Panel.
(3)
Screws for Laser Cover.
These panels are located inside the bottom of the laser machine upon shipment.
Remove them and follow the procedure exactly to properly install the panels.
Tools Needed:
Allen Wrenches.
1. Install the (2) right side panel by pulling down the quick release pin and
positioning the pins in the pin holes of the laser machine door frame.
2. Remove the (3) four screws on the (1) Laser Tube Cover.
3. Position the Laser tube cover and re-install the screws..