Explanation of the operating elements
Operation
14
Sensors
Outdoor sensor AF
S
Installation location:
•
Wherever possible, on a northerly or north-easterly
wall behind a heated room
•
Approx. 2.5 m above ground
•
Not above windows or ventilation shafts
Installation:
•
Detach the cover
•
Attach the sensor with the supplied
screw
Immersion sensor KF
H
/ SPF
F
Installation location:
•
In the immersed pipe of the hot-water cylinder tank
(generally on the front face of the tank)
Installation:
•
Slide the sensor as far as possible into
the immersed pipe.
!
The immersed sleeve must be dry.
Flow sensor VF
v
Installation location:
•
In the case of boiler control instead of the boiler sensor
KF as close as possible behind the boiler on the
heating flow pipe
•
In the case of mixer operation
v
approx. 0.5 m behind
the circulation pump
Installation:
•
Thoroughly clean the flow pipe.
•
Apply heat conductive paste (A)!!
•
Secure sensor with stretch band.