background image

Page 8

LAARS Heating Systems

Figure 6. Control Components

* Specify Serial Number

#

Part Description

Part #

1

Combustion Coil (Primary H-X) HWG

2400-086

Combustion Coil (Primary H-X) CB

2400-284

2

Economizer Coil (Secondary H-X)

10-078

3

Upper Head

10-034

4

Inner Shroud

10-112

5

Outer Shroud

10-124

6

Ignitor (w/Gasket) after s/n 391-126
791-044

2400-286

6

Ignitor, before s/n 391-127 791-045

2400-248

7

Burner (Flameholder) (w/Gaskets)

2400-082

Burner (w/Gaskets) (250 Series)

2400-308

8

Upper Insulation (Blanket)

10-048

9

Upper Insulation (Board)

10-050

10

Lower Insulation (Board)

10-106

11

Lower Insualtion (Blanket)

10-108

12

Gasket, Igniter (1 req'd)

10-332

13

Gasket, Burner (2 req'd)

10-338

14

Gasket, Blower Inlet (1 req'd)

1-254

15

Gasket, Blower Discharge (1 req'd)

10-324

Gasket, Blower Discharge (250 series)

11-066

16

Blower Assembly (w/Gaskets)

2400-079

Blower Assembly (w/Gaskets) (250)

2400-310

17

Orifice, Air

*

18

Orifice, Gas

*

19

Orifice Union

1-252

20

Mixer Tube

10-252

Mixer Tube (250 Series)

11-016

21

Air Duct Hose

1-458

Air Duct Hose (250 Series)

11-038

22

Gas Valve Balance Line

2400-026

*Not available separately - purchase orifice kit for type of gas

and input desired.

#

Part Description

Part #

23

Jacket, Front Removeable

10-402

24

Jacket, Top

10-406*

25

Jacket, Bottom

10-010

26

Control, Boiler Integrated

2400-224

27

Transformer, 40 VA

2400-006

28

Time Delay Relay

2400-062

29

Wiring Harness

10-354

30

Stack Switch

2400-110

31

Operating Control

2400-056

32

Safety Limit

2400-055

33

Intake T.C.O.

2400-058

34

Exhaust T.C.O.

2400-058

35

T.C.O.

2400-020

36

Gas Valve

2400-014

Gas Valve (250 Series)

2400-015

37

Capacitor (Blower Start/Run)

2400-088

38

Pump, Grundfos UP 26-99-BF   CB
                                                  CB-250
                                                  HWG
                                                  HWG-250

2400-386
2400-387
2400-388
2400-389

39

Valve, Pressure Relief (150 PSI)

2400-094

Valve, Pressure Relief (250 Series)

2400-095

40

Valve, Pressure Relief (125 PSI)

2400-096

Valve, Pressure Relief (250 Series)

2400-097

41

Diverting Valve (Complete)

2400-001

42

Thermostat (O-Rings
included)(160°F)
before S/N 394-068 or 795-0014

2400-129

Thermostat (O-Rings
included)(140°F)
before S/N 394-067 or 795-0013

2400-130

43

Terminal, Intake

2400-102

44

Terminal, Exhaust

2400-104

45

Flange, Wall, Vent Pipe

2400-100

46

Exhaust Assembly

2400-390

Exhaust Assembly (250 Series)

2400-402 

BLOWER
ASSEMBLY

BLOCKED
FLUE
DETECTOR

IGNITER ASSY

GAS VALVE

VENT
THERMAL
CUT OUT

INTAKE
THERMAL
CUT OUT

THERMAL
CUT OUT

16

30

6

36

34

33

35

32

HIGH LIMIT

SAFETY

SWITCH BOX

OPERATING LIMIT

CIRCULATOR PUMP

31

38

CONTROL BOX
SUB-ASSY

HEATMAKER
9600

Summary of Contents for HWG-M2-250

Page 1: ...r installation and or operation will void the warranty WARNING If the information in this manual is not followed exactly a fire or explosion may result causing property damage personal injury or loss...

Page 2: ...h 10 1G BoilerControl 10 1H Stack Switch 11 1I Igniter 11 1J Transformer 11 1K Unit Pump 11 1L Blower 11 1M GasValve 11 1N TimeDelayRelay TDR 11 1O OperatingControl 11 1P VentTCO 12 1Q IntakeTCO 12 1R...

Page 3: ...ondensation temperature of the water vapor in the flue gases A circulator is built into the unit to provide enough head to circulate water through the H X s and to a secondary heating loop or separate...

Page 4: ...pical D Combustion Coil Outlet E Hot Water Outlet To Tank or System 160 170 F Typical 160 FTHERMOSTAT Figure 2a Water Flow through a Heatmaker 9600 HWG Before S N 394 068 CB Before S N 795 0014 THERMO...

Page 5: ...urner 8 Secondary Heat Exchanger 9 Primary Heat Exchanger 10 Return From Primary Loop 11 Gas Valve 12 Flow To Primary Loop A Secondary Heat Exchanger Inlet B Secondary Heat Exchanger Outlet C Primary...

Page 6: ...ow Through Heatmaker 9600 43 INTAKE TERMINAL 50 WALL PLATE AIR INTAKE 45 WALL PLATE 44 EXHAUST TERMINAL EXHAUST AIR ORIFICE GAS ORIFICE GAS 1 COMBUSTION COIL 2 ECONOMIZER 7 FLAMEHOLDER 46 EXHAUST ASSE...

Page 7: ...9600 CB HWG Service Manual Page 7 Figure 4 Cut Away View of Heatmaker 9600 Figure 5 Control Box...

Page 8: ...nd input desired Part Description Part 23 Jacket Front Removeable 10 402 24 Jacket Top 10 406 25 Jacket Bottom 10 010 26 Control Boiler Integrated 2400 224 27 Transformer 40 VA 2400 006 28 Time Delay...

Page 9: ...minal and at least 6 152mm into the flue pipe The unit must operate for 5 minutes before taking a sample Take a sample and determine the CO2 or O2 CO2 8 to 8 5 natural gas O2 7 to 6 CO2 9 to 9 8 propa...

Page 10: ...ostatically controlled device which keeps the primary heat exchanger H X from operating in the condensing mode When return water from the storage tank or the system is below 130 F 54 C the diverting v...

Page 11: ...d unplug the power wires from the blower motor Disconnect intake exhaust vents and remove top jacket Remove the six bolts and nuts from the blower discharge flange and the four nuts from the blower in...

Page 12: ...n the gas valve The gas supply to the boiler must be shut off before making this connection The Heatmaker boiler is designed to operate with supply pressures of 4 14 in W C 8 1 oz in2 with the boiler...

Page 13: ...se the flame signal The control then causes a restart and if the flame signal is sensed on the restart then the burner will operate again The intermittent sending and losing of the flame signal by the...

Page 14: ...solution is no longer foamy 7 Shut off pump and disconnect from hose Carefully drain solution from hoses and connect city water to lower hose to flush combustion coil Flush for approximately 5 minutes...

Page 15: ...on and no indicator lights are flashing check for an open vent TCO operating control or safety limit switch For additionaltroubleshootinginformationrefertothe trouble shooting flow charts on the page...

Page 16: ...VOLTAGE 120 VAC BETWEEN BLACK AND WHITE WIRES AT BACK OF 120 VAC CONNECTORON BOILERCONTROL DIDBOILERRUNTHROUGHA COMPLETE CYCLE AS DE SCRIBED IN SEQUENCE OF EVENTS PAGE 20 TESTLIMIT CIRCUIT PAGE 17 PUM...

Page 17: ...OHMSCALE CONTINUITY CONTINUITY CONTINUITY NOCONTINUITY OHMS NOCONTINUITY TESTING LIMIT CIRCUIT YOU MUST COMPLETE PAGE 16 FIRST NOTE AFTER COMPLETEING LIMIT CIRCUIT TESTING PLUG IN CONTROL PLUG AND REC...

Page 18: ...EAVESETC AGAINST VENTTERMINAL CYCLE BOILER MANY TIMES TO TRY TO CREATE A MALFUNCTION CLEAR BLOCKAGE AND RECYCLEBOILER CHECKSTACKSWITCH BLOCKAGE EXISTS NO BLOCKAGE NO YES YES NO RED PURGE LIGHT FLASHIN...

Page 19: ...TSTACKSWITCH TUBES AND CHECK FOR CONTINUITYBETWEENSTACK SWITCHTERMINALSWITH BLOWEROPERATING CHECKFORVENTOBSTRUCTIONS CLEAROBSTRUCTIONS RECONNECTTUBES ELEC TRICALWIRESTOSTACK SWITCH START BOILER RUN TH...

Page 20: ...SSURETAP ON GAS VALVE PRESSURE DURING BLOWER OPERATIONWITHOUTGASFLOW VALVE FLAME LIGHT NOT LIT IS 4 IN W C CHECK FOR VOLTAGE 120 VAC ATBLOWERWIRECONNECTOR WITHIN5MINS AFTERGREEN LIGHT BLOWER O K REPLA...

Page 21: ...G LITE CHECKCOMBUSTION CHECKIGNITER IGNITEROK CHECK FOR GAS FLOW IS METER MOVING REPLACE IGNITER REPLACEINTEGRATEDBOILERCONTROLP N2400 224 INSTALL CORRECT ORIFICES BOILERCYCLESTHROUGHTHREECYCLESAFTER...

Page 22: ...L PLUG CN6 THERE IS 120 VAC AT CIRCULATOR PLUG CN5 TURNUPT STATORAQUASTATOR CORRECTSTATPROBLEM NO YES NO YES SEETROUBLESHOOTING CHART PAGE 16 THERE IS 120 VAC AT PUMP REPLACEBOILER CONTROLP N2400 224...

Page 23: ...23 Figure 9 9600 Ladder Diagram Figure 10 9600 Wiring Diagram Caution Label all wires prior to disconnection when servicing controls Wiring errors can cause improper and dangerous operation Verify pr...

Page 24: ...sure of 9 3 Remove blower and inspect flameholder burner for hole 4 Check that the blower flanges and gas piping are sealed D OCCASIONAL LOCKOUTS Requires interruption of power to re start or reset of...

Reviews: