1
1
3
4mm
࠶࠻ࡆࠬ
˴˴˴˴
Set Screw
4
2
5mm TP
ࡆࠬ
˴˴˴˴ ˴
Screw
2
3
10mm TP
ࡆࠬ
˴˴˴˴ ˴
Screw
33
32
࿑ߩࠡࡗࠍ࿁ߒߡߺߡޔ࠹࡞
ࡠ࠲߇㚟േߔࠆ߆⏕ߔࠆޕ
Rotate the gear and check
if the tail rotor rotates.
࠹࡞ࡉࡓߪޔ࿑ߩ⟎߹ߢ
ᔅߕᏅߒㄟޕ
Insert the tail boom up to the
mark indicated.
࿑ߩ⟎߹ߢߨߓㄟޕ
Twist as the diagram shows.
3mm
1
3
20mm
ࠠࡖ࠶ࡊࡆࠬ
˴˴˴˴
Cap Screw
1
3mm
࠽ࠗࡠࡦ࠽࠶࠻
˴
Nylon Nut
407
406
454
3
20mm
2
5mm
↪ߔࠆⴼޕ
Part bags used.
Ꮐฝหߓࠃ߁ߦ⚵┙ߡࠆޕ
Assemble left and right
sides the same way.
2
1
5
4
3
⇟ภߩ㗅ߦ⚵┙ߡࠆޕ
Assemble in the
specified order.
VR-8
࠹࡞ࡄࠗࡊขઃߌ
Tail Pipe
VR-6, VR-11, VR-12
࠹࡞ࡉࡓ
Tail Boom
2mm
ࠬ࠻࠶ࡄ
˴˴5VQRGT
ࠁࠆࠆޕ
Loosen the screws.
ߒࠆޕ
Tighten the screws.
⍍㑆ធ⌕ߢធ⌕ߔࠆޕ
Apply instant glue
(CA glue, super glue).
㧔ᓟࠈ߆ࠄߺߚߣߎࠈ㧕
View from back.
453
⚂
60mm
approx. 60mm
3
4mm
454
453
542
15mm
453
࿑ߩࠃ߁ߦߥࠆ⟎ߢ࠶࠻ࡆࠬࠍߒࠆޕ
Tighten the set screw when a 90¡ angle
is produced.
90
q
ਛᄩ
Neutral
19
407
3
10mm
2
5mm
2
3