2PR
1-5-30
6. Release the lock lever and then remove the
link lever.
7. Remove three connectors and three FFCs
from the engine PWB.
Figure 1-5-39
YC6
YC5
YC617
YC13
YC14
YC600
FFC
Link lever
Link lever
FFC
Connector
Connector
Connector
Connector
Connector
(ID solenoid)
Engine PWB
Engine PWB
Engine PWB
FFCs
FFCs
Lock lever
Summary of Contents for ECOSYS P7035cdn
Page 1: ...SERVICE MANUAL Published in May 2014 842PR111 2PRSM061 Rev 1 ECOSYS P7035cdn...
Page 4: ...This page is intentionally left blank...
Page 10: ...This page is intentionally left blank...
Page 14: ...2PR This page is intentionally left blank...
Page 20: ...2PR 1 1 6 This page is intentionally left blank...
Page 28: ...2PR 1 2 8 This page is intentionally left blank...
Page 48: ...2PR 1 3 20 This page is intentionally left blank...
Page 154: ...2PR 2 1 20 This page is intentionally left blank...
Page 177: ......
Page 178: ......