2MH/2MJ/2MK/2ML
1-5-31
5. Remove the transfer roller’s shaft from
the both transfer bushes.
6. Remove the gear Z16 from the transfer
roller.
Figure 1-5-45
7. Check or replace the transfer roller and
refit all the removed parts.
Caution: When refitting the transfer
roller, be careful about following point.
Push the release lever to raise the lever
end, then insert the front of gear Z16
under the release lever end.
Figure 1-5-46
Transfer roller
Shaft
Shaft
Transfer roller
Transfer bush
Transfer bush
Gear Z16
Release lever
Gear Z16
Transfer bush
Transfer bush
Transfer roller
Summary of Contents for ECOSYS FS-1035MFP/DP
Page 4: ...This page is intentionally left blank ...
Page 10: ...This page is intentionally left blank ...
Page 25: ...2MH 2MJ 2MK 2ML 1 1 11 This page is intentionally left blank ...
Page 97: ...2MH 2MJ 2MK 2ML 1 3 66 This page is intentionally left blank ...
Page 141: ...2MH 2MJ 2MK 2ML 1 4 44 This page is intentionally left blank ...
Page 223: ...2MH 2MJ 2MK 2ML 2 1 24 This page is intentionally left blank ...
Page 229: ...2MH 2MJ 2MK 2ML 2 2 6 This page is intentionally left blank ...
Page 266: ...INSTALLATION GUIDE INSTALLATION GUIDE FOR PAPER FEEDER ...
Page 267: ......
Page 268: ......