
21
1. Assembly
21
•
Tools
:
Pipe, hammer, snap ring pliers,
Torquemeter, adjustable wrench, chisel.
NOTES
• Clean all the components from remaining grease and silicone.
• Replace any particular damaged.
• When assembling the taper roller bearings, pay attention to not
make any pressure on the cages in order to avoid any damage.
• When assembling oil seals avoid contact with cutting parts
in order to prevent any damage to the inner lip.
• Insert oil seals taking care or greasing the zone of contact
between oil seal and shaft.
• Assemble outer ring (5) inside the housing
• Insert the inner ring (5).
• Assemble inside housing: Spacer (65),
gear(31), spacer(20),gear (17),spacer(16),
shim (1),gear (7)
• Assemble shaft (29) paying attention to fit
all components previously assembled
.
• Assemble: spacer (2) and inner ring (5).
• Assemble: outer ring (5) and snap ring (3)
• Set the shaft (29) by hitting from both sides
• Check the axis preload (
K
),use torquemeter
• Disassemble snap ring (3).
• Assemble shims (6) and snap ring (3).
• Set the shaft(29) by hitting from both sides
• Check the axis preload (
W
),use torquemeter
• The difference between, value
(W)
and
(K)
the axis preload that must be to 0÷3 kgcm.
If the value is not correct change shims (6) setting.
• Assemble: spring(50),spacer (63), piston 53)
and snap ring (52).
• Assemble spacer(63),piston(53),snap ring(52)
• Assemble shim(13),snap ring(8),inner ring(12)
• Put a Loctite 270 film on locknut (11) threads
• Assemble locknut (11) and tighten manually
in order to fix the taper roller bearing (12).
• Caulk the locknut.
Summary of Contents for H Series
Page 5: ...5 5 General data and equipment Road transport 3100 mm 1650 mm Total weight 3 900 kg ...
Page 6: ...6 6 Rear view Front view Road transport General data and equipment 2900 mm 3100 mm ...
Page 7: ...7 General data and equipment Total weight 3 900 kg 7 Working position ...
Page 8: ...8 8 Rear view Front view General data and equipment Working position 6000 mm ...
Page 9: ...9 9 700 mm 1730 mm 1500 mm Working position Total weight 3 900 kg General data and equipment ...
Page 14: ...14 General data and equipment Construction 14 ...
Page 17: ...17 17 General data and equipment Leveling bar equipment ...
Page 31: ...31 31 4 Technical specifications ...
Page 32: ...32 Basic hydraulic circuit std equipment schematics hydraulic 32 ...
Page 33: ...33 33 Basic hydraulic circuit std equipment Distributor block ...
Page 34: ...34 Basic hydraulic circuit std equipment Roller sequence circuit 34 ...
Page 35: ...35 35 Basic hydraulic circuit std equipment Folding circuit ...
Page 36: ...36 36 Basic hydraulic circuit std equipment Transport lock circuit ...
Page 37: ...37 37 Basic hydraulic circuit std equipment Roller lift circuit ...
Page 38: ...38 38 Basic hydraulic circuit std equipment Line markers circuit optional ...
Page 39: ...39 39 Hydraulic circuit electro hydraulic controls schematics hydraulic ...
Page 40: ...40 40 Hydraulic circuit electro hydraulic controls Connections and functions ...
Page 41: ...41 41 Hydraulic circuit electro hydraulic controls Folding transport lock circuit ...
Page 42: ...42 42 Hydraulic circuit electro hydraulic controls Roller lift circuit ...
Page 43: ...43 43 Hydraulic circuit Control panel schematics hydraulic ...
Page 44: ...44 44 Hydraulic circuit Control panel Junction Box Control box ...
Page 45: ...45 45 Hydraulic circuit Control panel Interface on coulter bar brackets ...
Page 46: ...46 46 Hydraulic circuit Control panel Line marker function ...
Page 47: ...47 47 Hydraulic circuit Control panel Pre emergence marker function ...
Page 48: ...48 48 Hydraulic circuit Control panel Coulter bar lift ...
Page 49: ...49 49 Hydraulic circuit Control panel Coulter bar pressure ...
Page 50: ...50 50 Hydraulic circuit Control panel Pre emergence marker function ...
Page 52: ...52 52 Requests ...