Replacing Tooling in the Back Section
3-38
990-HQ Service Manual
Changing the Bore Drill
Caution:
Turn off all power to the machine. Follow proper lockout/tagout procedures
as detailed in the safety section of Chapter 1 of this manual.
1.
Remove Dust Collection Guard
2.
Use the shaft wrench and collet
wrench to remove the bit on the
pre-drill or router assemblies. See
photo.
When loosening the collet, it may
tighten up, crack again and con-
tinue.
3.
Inspect and clean collet assembly.
4.
Insert the new bit into the assem-
bly.
5.
Before tightening the collet assembly, adjust the bit depth. Bottom out the bit and
pull the bit up about 1.4''.
6.
Lightly tighten and torque to correct value. For torque values,
Note:
Make sure the arbor is not bottomed out in the back of the motor. If it is, the
arbor will not tighten and will damage the collet or other machine parts.
Note:
The figure shows the cover off for training purposes.
Collet Wrench (PN:
15-00-ER32)
Shaft Wrench (1-5/8 '')
(PN: WRENCH026)
Summary of Contents for 990-HQ
Page 4: ...KVAL 990 HQ Service Manual ...
Page 9: ...Notes ...
Page 29: ...Safety Sign Off Sheet 1 20 990 HQ Service Manual ...
Page 38: ...Network System Overview 2 9 990 HQ Service Manual ...
Page 65: ...Lubrication Points on the 990 HQ 3 27 990 HQ Service Manual FIGURE 3 18 Bearings Back Section ...
Page 79: ...Collet Torque Values 3 41 990 HQ Service Manual ...
Page 80: ...Appendix Conversion Chart 3 42 990 HQ Service Manual Appendix Conversion Chart ...
Page 81: ...Appendix Conversion Chart 3 43 990 HQ Service Manual ...
Page 108: ...Troubleshooting with the Status Light Panel 4 27 990 HQ Service Manual ...
Page 111: ......