Kval 990-HQ
1-1
Index
A
air input system
air line lubricator
air line lubricator, maintenance schedule 17
B
back section nodes
ball screw, maintenance schedule 17
Beckhoff® CPU module 2
bit assemblies
bits
C
chisels
collet assembly
computer
control panel light
D
dura-lith grease, bearing lube 17
DVI/USB module location 2
E
EtherCat®
smart power supply 2
terminals,location 2
ethernet module
connection to servo amplifiers 2
F
flange block bearing, maintenance schedule 17
frame node
I
inductive proximity sensor 19
internet access
location of connection 2
remote connection 2
RJ45 to intranet 2
intranet
as a remote access 3
RJ45 connection 2
K
L
LCD display
linear bearing, maintenance schedule 17
lockout and tagout Guidelines 12
lockout procedure 10
Lubrcation Schedule 17
Lubrication 17
Lubrication Schedule 17
N
network system
nodes
P
pillow block bearing, maintenance schedule 17
PLC
battery location 2
connections 2
location 2
power
power up
pre-drill bit
using tool to set depth 38, 39
product return procedure 14
programmable logic controller,PLC 2
Summary of Contents for 990-HQ
Page 4: ...KVAL 990 HQ Service Manual ...
Page 9: ...Notes ...
Page 29: ...Safety Sign Off Sheet 1 20 990 HQ Service Manual ...
Page 38: ...Network System Overview 2 9 990 HQ Service Manual ...
Page 65: ...Lubrication Points on the 990 HQ 3 27 990 HQ Service Manual FIGURE 3 18 Bearings Back Section ...
Page 79: ...Collet Torque Values 3 41 990 HQ Service Manual ...
Page 80: ...Appendix Conversion Chart 3 42 990 HQ Service Manual Appendix Conversion Chart ...
Page 81: ...Appendix Conversion Chart 3 43 990 HQ Service Manual ...
Page 108: ...Troubleshooting with the Status Light Panel 4 27 990 HQ Service Manual ...
Page 111: ......