//
ORIGINAL OPERATING INSTRUCTIONS
Commissioning
25.04.2019
31/54
Two-chamber operation:
screw LH
➯
screw RH
➯
7.8
Weighing of spreading materials
1
Fill in spreading material into spreader.
2
Fill screw tunnel (See Chapter
)!
3
Start setup menu (see Chapter
7.2 "Start/finish setup menu", page 25
).
4
Actuate several times.
Example: One-chamber operation
➯
5
Place a reservoir that is appropriately large under the screw conveyor outlet.
6
Press and hold it pressed.
➯
•
Top line: weight
theoretically spread [kg]
•
Lower line: Pulses
For a more detailed setting, we
recommend to take out 20 kg.
7
Weigh spreading material and compare it with number above.