//
ORIGINAL OPERATING INSTRUCTIONS
Commissioning
25.04.2019
36/54
7.13 Electrical monitoring of spreading process
1
Start setup menu (see Chapter
7.2 "Start/finish setup menu", page 25
).
2
Actuate several times.
0 = electrical monitoring of spreading process
not
available.
➯
3
Actuate.
1 = electrical monitoring of spreading process
available.
➯
7.14 Rotating beacon
1
Start setup menu (see Chapter
7.2 "Start/finish setup menu", page 25
).
2
Actuate several times.
0 = Rotating beacon
not
available.
➯
3
Actuate.
1 = Rotating beacon available.
➯