
Service - 190
RT120Q Operator’s Manual
As Needed
13. Use hoist to pull front end of chain over head shaft sprocket.
14. Move chain down boom until chain connector pin and lock key can be installed. Install connector pin
and lock key.
15. Tighten chain by pumping EPG into grease cylinder.
Time Augers
Ensure that augers are balanced, as shown. If
auger timing is off, unit will bounce from side to
side even in normal digging conditions.
To adjust timing:
1.
Remove bolts holding augers to auger shaft
and rotate either auger as needed until augers
are balanced.
2.
Reinstall bolts and tighten securely.
Plow
Clean Feed Tube
Clean feed tube as needed.
Summary of Contents for RT120Q
Page 1: ...RT120Q Operator s Manual Issue 2 0 Original Instruction 053 2634 ...
Page 7: ...Overview 6 RT120Q Operator s Manual About This Manual ...
Page 75: ...Operation Overview 74 RT120Q Operator s Manual Leaving Jobsite ...
Page 83: ...Prepare 82 RT120Q Operator s Manual Check Supplies and Prepare Equipment ...
Page 89: ...Drive 88 RT120Q Operator s Manual Shut Down ...
Page 101: ...Transport 100 RT120Q Operator s Manual Retrieve ...
Page 115: ...Plow 114 RT120Q Operator s Manual Finish Job ...
Page 127: ...Backhoe 126 RT120Q Operator s Manual Finish Job ...
Page 140: ...RT120Q Operator s Manual Saw 139 Saw Chapter Contents Set Up 140 Operate 141 Finish Job 143 ...
Page 145: ...Saw 144 RT120Q Operator s Manual Finish Job ...
Page 193: ...Service 192 RT120Q Operator s Manual As Needed ...
Page 213: ...Specifications 212 RT120Q Operator s Manual Declaration of Conformity Information ...
Page 216: ......
Page 217: ......
Page 218: ...RT120Q Operator s Manual Service Record 217 Service Record Service Performed Date Hours ...
Page 219: ...Service Record 218 RT120Q Operator s Manual Service Performed Date Hours ...