Service - 172
RT120Q Operator’s Manual
50 Hour
Trencher
Check Trencher Gearbox Oil Level
Check oil at sight tube every 50 hours. Keep oil
level at horizontal line on housing. If necessary,
add MPL at fill plug.
Plow
Change Plow Vibrator Oil
Change plow vibrator oil after first 50 hours of
operation. Drain oil at drain plug (2). Replace plug
and move plow vibrator to horizontal position. Add
MPL at fill (1) until oil is halfway up sight glass (2).
Refill capacity is 4 qt (3.8 L).
Hot parts may cause burns. Do not touch until
cool or wear gloves.
Summary of Contents for RT120Q
Page 1: ...RT120Q Operator s Manual Issue 2 0 Original Instruction 053 2634 ...
Page 7: ...Overview 6 RT120Q Operator s Manual About This Manual ...
Page 75: ...Operation Overview 74 RT120Q Operator s Manual Leaving Jobsite ...
Page 83: ...Prepare 82 RT120Q Operator s Manual Check Supplies and Prepare Equipment ...
Page 89: ...Drive 88 RT120Q Operator s Manual Shut Down ...
Page 101: ...Transport 100 RT120Q Operator s Manual Retrieve ...
Page 115: ...Plow 114 RT120Q Operator s Manual Finish Job ...
Page 127: ...Backhoe 126 RT120Q Operator s Manual Finish Job ...
Page 140: ...RT120Q Operator s Manual Saw 139 Saw Chapter Contents Set Up 140 Operate 141 Finish Job 143 ...
Page 145: ...Saw 144 RT120Q Operator s Manual Finish Job ...
Page 193: ...Service 192 RT120Q Operator s Manual As Needed ...
Page 213: ...Specifications 212 RT120Q Operator s Manual Declaration of Conformity Information ...
Page 216: ......
Page 217: ......
Page 218: ...RT120Q Operator s Manual Service Record 217 Service Record Service Performed Date Hours ...
Page 219: ...Service Record 218 RT120Q Operator s Manual Service Performed Date Hours ...