
Service - 180
RT120Q Operator’s Manual
500 Hour
Change Hydraulic Fluid and Filter
Change hydraulic fluid and filter every 500 hours.
Change hydraulic fluid and filter every 250 hours if
jobsite temperature exceeds 100°F (38°C) more
than 50% of the time.
To change:
1.
Remove drain plug (1).
2.
Drain fluid and replace plug.
3.
Change filter (2).
4.
Add THF at fill (3).
Test Coolant Freeze Protection Level
With engine cool, test coolant freeze protection
level using a hydrometer or refractometer.
Recommended freeze protection level is -34°F
(-37°C). Adjust as needed.
If colder temperatures are expected, consult your
Ditch Witch
®
dealer or coolant supplier.
Use pre-dilluted coolant to maintain proper freeze
protection.
IMPORTANT:
See page 158 for information on
approved coolants.
t37om031w.eps
1
2
3
t37om019w.eps
Summary of Contents for RT120Q
Page 1: ...RT120Q Operator s Manual Issue 2 0 Original Instruction 053 2634 ...
Page 7: ...Overview 6 RT120Q Operator s Manual About This Manual ...
Page 75: ...Operation Overview 74 RT120Q Operator s Manual Leaving Jobsite ...
Page 83: ...Prepare 82 RT120Q Operator s Manual Check Supplies and Prepare Equipment ...
Page 89: ...Drive 88 RT120Q Operator s Manual Shut Down ...
Page 101: ...Transport 100 RT120Q Operator s Manual Retrieve ...
Page 115: ...Plow 114 RT120Q Operator s Manual Finish Job ...
Page 127: ...Backhoe 126 RT120Q Operator s Manual Finish Job ...
Page 140: ...RT120Q Operator s Manual Saw 139 Saw Chapter Contents Set Up 140 Operate 141 Finish Job 143 ...
Page 145: ...Saw 144 RT120Q Operator s Manual Finish Job ...
Page 193: ...Service 192 RT120Q Operator s Manual As Needed ...
Page 213: ...Specifications 212 RT120Q Operator s Manual Declaration of Conformity Information ...
Page 216: ......
Page 217: ......
Page 218: ...RT120Q Operator s Manual Service Record 217 Service Record Service Performed Date Hours ...
Page 219: ...Service Record 218 RT120Q Operator s Manual Service Performed Date Hours ...