12
SERVICE WORK ON THE CHASSIS
53
M00138-10
(EXC Six Days US)
–
Release screws
. Take out the left fork leg.
–
Release screws
. Take out the right fork leg.
12.6
Installing the fork legs
M00992-10
Main work
(EXC US)
–
Position the fork legs.
Bleeder screws
are positioned toward the front.
Info
Grooves are milled into the side of the upper end of the fork legs. The
second milled groove (from the top) must be flush with the top edge of
the upper triple clamp.
M00991-11
–
Tighten screws
.
Guideline
Screw, top triple clamp
M8
20 Nm
(14.8 lbf ft)
–
Tighten screws
.
Guideline
Screw, bottom triple clamp
M8
15 Nm
(11.1 lbf ft)
K00088-10
–
Position brake caliper, and mount and tighten screws
.
Guideline
Screw, front brake
caliper
M8
25 Nm
(18.4 lbf ft)
Loctite
®
243™
–
Mount cable binder.
–
Position the brake line, wiring harness, and clamp. Mount and tighten
screws
.
M00137-10
(EXC Six Days US)
–
Position the fork legs.
Bleeder screws
are positioned toward the front.
Info
The rebound damping is located in the right fork leg
REB
(red adjusting
screw). The compression damping is located in the left fork leg
COMP
(white adjusting screw).
Grooves are milled into the side of the upper end of the fork legs. The
second milled groove (from the top) must be flush with the top edge of
the upper triple clamp.
M00138-11
–
Tighten screws
.
Guideline
Screw, top triple clamp
M8
17 Nm
(12.5 lbf ft)
–
Tighten screws
.
Guideline
Screw, bottom triple clamp
M8
15 Nm
(11.1 lbf ft)