5 Installation at Site
21 of 36
AmaRoc
7.
Free-standing model: Place the insert sleeve into the square guide rail.
8.
Models installed with an upper holder: Place the upper holder into the square
guide rail.
9.
Bolt the upper holder to the tank wall.
For concrete walls:
Drill holes. Diameter
9
/
16
" [14 mm], depth: 4
15
/
16
" [110 mm] for chemical anchors
1
/
2
x 6
5
/
16
" [M12 x 160]
Tightening torque: 25.8 lbf ft [35 Nm]
For walls or bridges made of steel:
Mount the upper holder with site-supplied
1
/
2
" [M12] bolts, depending on the
structural requirements. Tightening torque: 44.3 lbf ft [60 Nm]
10.
Tighten the
5
/
8
" [M16] bolts (for upper holder with swivelling option).
Tightening torque 110.6 lbf ft [150 Nm].