5 Installation at Site
16 of 36
AmaRoc
5 Installation at Site
5.1 Safety regulations
DANGER
Improper installation in potentially explosive atmospheres
Explosion hazard!
Damage to the submersible mixer!
▷
Comply with the applicable local explosion protection regulations.
▷
Observe the information given in the data sheet and on the name plate.
5.2 Prerequisites
Installation of the submersible mixer stand requires:
▪
At least two fitters
▪
Suitable lifting equipment of sufficient load-carrying capacity with approved
lifting tackle
▪
Applicator gun for commercial cartridges
▪
Compressed air for cleaning the drilled holes
▪
Portable drill with hard metal drill bit (better: core drill bit)
–
Ø
3
/
4
" [18 mm], hole depth 4
15
/
16
" [125 mm] - for mounting the stand on the
floor
–
Ø
9
/
16
" [14 mm], hole depth 4
5
/
16
" [110 mm] - for mounting the upper guide
rail holder
▪
Metal drill bit
–
Ø
3
/
8
" [10 mm] - for locking the square guide rail in position
▪
Open-jawed or ring spanner for hexagon head bolt
1
/
2
" (
3
/
4
") [M12 (WAF 19)],
5
/
8
" (1") [M16 (WAF 24)]
▪
Torque wrench
▪
Cut-off grinder for cutting the square guide rail to length
▪
Welding unit for welding on a guide rail extension (if required)
5.3 Checks to be carried out prior to installation
5.3.1 Preparing the place of installation
WARNING
Installation on foundations which are unsecured and cannot support the load
Personal injury and damage to property!
▷
Make sure the foundation concrete is of sufficient strength (min. 3000 psi [class
C25/30 to DIN 1045]).
▷
Only place the submersible mixer stand on a foundation whose concrete has set
firmly.
▷
Refer to the weights given in the data sheet/on the name plate.
1.
Check the structural requirements.
All structural work required must have been prepared in accordance with the
dimensions stated in the outline drawing/general arrangement drawing.
2.
Clean the concrete surface; if required, clean with a broom to remove any loose
particles.