5 Installation at Site
18 of 36
AmaRoc
5.4.2 Setting up the submersible mixer stand
ü
The submersible mixer stand has been removed from the pallet, pulled upright
and set down, securely attached to a crane (taut rope), on solid ground directly
next to the place of installation.
1.
Place the submersible mixer stand into the soft chemical mortar in the marked
out area.
2.
Drill the holes.
Diameter:
3
/
4
" [18 mm], depth: 4
15
/
16
" [125 mm] from upper concrete edge
(Use the bushes integrated at the fixing points as drilling templates.)
3.
Thoroughly clear the holes of any drilling dust.
4.
Insert the mortar cartridges into the drilled holes (two cartridges per hole).
5.
Crack the fitted mortar cartridges open with a threaded rod.
Work quickly, bearing in mind the curing time of the chemical mortar! Observe
the manufacturer's application instructions!
6.
Insert the threaded rods with a drill and clamping chuck.
Observe the processing time of the two-part resin! Also refer to the instructions
given on the packaging of the mortar cartridges.
7.
Tighten the chemical anchors. Tightening torque: 44.3 lbf ft [60 Nm]