Commissioning
57
Pos: 42.7 /Überschriften/Überschriften 2/U-Z/Vorbereitungen für die Erstinbetriebnahme @ 32\mod_1253109404174_78.docx @ 312138 @ 2 @ 1
5.1
Before initial start-up
Pos: 42.8 /BA/Erstinbetriebnahme/Rundballenpresse/Vorbereitungen Erstinbetriebnahme @ 226\mod_1392643174796_78.docx @ 1824323 @ @ 1
For reasons related to transport, the machine is delivered without the PTO shaft and bale
ejector. Before initial start-up, the machine must be completely assembled and adjusted to the
tractor type.
The following parts are included loose with delivery in some cases.
Pos: 42.9 /BA/Erstinbetriebnahme/Rundballenpresse/Teile Erstinbetriebnahme_Comprima CF/CV @ 298\mod_1412840255658_78.docx @ 2337402 @ @ 1
CP100050_3
4
2
3
1
5
6
7
Fig. 22
Pos.
Designation
Storage location
1
Can of spray paint
Twine box
2 Universal
shaft
Wrapping
table
3
Universal shaft support
Twine box
4
Hose support and cable support
Bale chamber
5
Fastening material
Twine box
6
Power supply on the tractor
Twine box
7
Universal shaft bracket for Comprima CV 210 Twine box
without fig.
Control unit (depending on the version)
Twine box
without fig.
Extension cable
Twine box
without fig.
Ring spanner 13
Twine box