![KROHNE OPTISONIC 1400 Quick Start Manual Download Page 19](http://html1.mh-extra.com/html/krohne/optisonic-1400/optisonic-1400_quick-start-manual_2004270019.webp)
INSTALLATION
2
19
OPTISONIC 1400
www.krohne.com
10/2016 - 4005626301 - QS OPTISONIC 1400 R01 en
Step 2
á
Place the paper on the pipe and align the centre line with the top line of the pipe
á
Make sure the paper is correctly placed in line with the flow direction
á
Punch all P1 marks on one side (right side when looking into the flow direction)
á
Punch all P2 marks on the other side (left side)
á
Remove the paper and mark the punch imprints with a marking pen
á
Draw circles of Ø 45 mm around the points
i
The positioning of the transducer is complete and ready to install the units
Figure 2-21: Determine top line on pipe
Figure 2-22: Transposing the P1-2 to the pipe
1
Paper roll template with both side markings
2
Fit the paper roll tightly around pipe and transpose the right side points
3
Do the same on the left side of the pipe
4
Marking points right - and left side