![Kranzle 11/130 Operating Maintenance Installation Download Page 52](http://html1.mh-extra.com/html/kranzle/11-130/11-130_operating-maintenance-installation_2002501052.webp)
52
Inspection sheet
All lines connected
Hose clamps tight
Screws all installed and tightened
Ignition cable plugged in
Visual check carried out
Brake function checked
Leak test
Water tank filled and checked
Water inlet checked for tightness
Float valve function checked
Machine checked for tightness under pressure
Electrical check
Earth line checked
Current intake
Operating pressure
Switch-off pressure
Customer
.................................................
Summary of Contents for 11/130
Page 30: ...30 Complete Assembly...
Page 32: ...32 Electronics switchbox...
Page 36: ...36 Combustion chamber...
Page 38: ...38 Combustion chamber...
Page 44: ...44 Valve housing...
Page 48: ...48 Hose drum Special accessory Upgrade kit 44 152 2...
Page 56: ...Reprint only allowed with the authorization of As date of 15 04 2009 Order No 30 702 1 R...