![Kranzle 11/130 Operating Maintenance Installation Download Page 14](http://html1.mh-extra.com/html/kranzle/11-130/11-130_operating-maintenance-installation_2002501014.webp)
4
Commissioning
- Switch off the ignition. Rocker switch (16) to „0“.
- Set the pressure control (4) valve to maximum pressure
(see below) and close the detergent valve (20).
- Open the gun and switch the master switch (15) on.
The high pressure pump now presses the air out of the
lines, and after a short time the high pressure spray is
formed and the operating pressure is reached.
If the system has to be deaerated (appliance rattles), open
and close the spray gun repeatedly.
CAUTION
After an extended standstill do not instantly aim the high pressure
water jet at the object to be cleaned, as the remaining water
inside the high pressure cleaner may be discoloured.
Commissioning
15
16
17
20
19
18
14
Adjusting the pressure
Use the pressure control valve (4) directly
on the pump head to adjust the pressure.
turn left:
min.
turn right:
max.
The machine is fitted with a Total-Stop-System. If the gun is
closed for longer than approx. 20 seconds, the machine switches
off automatically, after 20 minutes the machine moves to safety
switch off and you must use the master switch to turn it back on.
The machine restarts automatically when the gun is operated,
provided that the master switch is on.
Summary of Contents for 11/130
Page 30: ...30 Complete Assembly...
Page 32: ...32 Electronics switchbox...
Page 36: ...36 Combustion chamber...
Page 38: ...38 Combustion chamber...
Page 44: ...44 Valve housing...
Page 48: ...48 Hose drum Special accessory Upgrade kit 44 152 2...
Page 56: ...Reprint only allowed with the authorization of As date of 15 04 2009 Order No 30 702 1 R...