8
The heating boiler should be stored in its factory packaging in a dry and
natural venting place at a temperature range from - 50ºC to + 50ºC and
annual humidity up to 60%.
3.2. Scope of supply
Boilers body with doors
1 pc
Scoop 1
pc
Scraper
1 pc
Technical passport. Installation and operation manual
1 pc
Air flap adjusting screw
1 pc
On request
Draft regulator
1 pc
The accessories are storied inside the boilers body and they are available
after opening the stocker door.
Please, inspect the integrity of the packaging upon delivery and also check
whether all the components, mentioned above, have been supply to you. If
any of the items are missing – contact your supplier.
4. INSTALLATION OF THE HEATING BOILER
CAUTION! The assembly and installation of the
boiler should be performed according your country
requirements and heating project documentation by a
service organization authorized for performing of this
operation. Always observe building supervision
instructions, in particular existing Ordinance on
combustion devices and storage of combustion
materials, as well as on building requirements
applicable to installation sites and on ventilation.
If the heating project documentation is not
obligatory, installation is recommended by the scheme
specified in the annex to this manual.
4.1. Installation of the boiler.
The installation of this heating boiler should be maintained according to
the recommendations of this operation manual.
4.1.1. Remove the factory packaging from the boilers body.