background image

E-2

2. Installation space

(Unit: mm (inch))

bizhub C750i + FS-540SD + LU-205

615

(24-3/16)

781

(30-3/4)

467.5

(18-3/8)

875.5

(34-7/16)

322

(12-11/16)

774.5

(30-1/2)

2492.5 (98-1/8)

1343 (52-7/8)

1

5

6

0

.5

 (6

1

-7

/1

6

)

1

2

0

7

(4

7

-1

/2

)

3

5

3

.5

(1

3

-1

5

/1

6

)

3. Pre-installation check items

(1) Select a level and stable place for installing the

machine.

(2) Be sure to use a power source of the voltage

and frequency indicated in the product specifi-
cations. Ensure that the current carrying ca-
pacity of the power outlet is at least equal to
the current listed in the product specifications.

(3) Power the machine directly from a dedicated

power outlet. (Do not use an extension cord.)

(4) Do not plug or unplug the power cord with wet

or dirty hands, otherwise you may get an elec-
tric shock.

(5) Avoid a hot and humid environment, or a place

exposed to direct sunlight.

(6) Avoid a dusty location, or a place near volatile

and flammable substances.

(7) Avoid a poorly ventilated place.

4. Notes on using touch panel

Be sure to instruct users on the following points.

• This machine uses a capacitive touch panel.

When you touch the touch panel, use your finger
or the stylus pen supplied with the machine.
If you touch the panel using your nail or a pen tip
instead of using your finger or the stylus pen, the
touch panel does not respond normally.

• Pressing the touch panel hard may cause dam-

age.

• Do not strongly press the panel or press it using

the sharp tip of mechanical pencils.

• The key is a finger tapping (quick light touch us-

ing a finger) operation.

Note:

If you proceed to install the Expanded Memory
Unit EM-908, install it before the setup of the main
body.

Summary of Contents for bizhub C750i

Page 1: ...602 RU 519 OT 514 UK 221 EM 908 Main body When installing the main body and associated options as a system follow the order shown on the upper CAUTION Main body mass approx 160 kg 352 3 4 lb Lifting...

Page 2: ...therwise you may get an elec tric shock 5 Avoid a hot and humid environment or a place exposed to direct sunlight 6 Avoid a dusty location or a place near volatile and flammable substances 7 Avoid a p...

Page 3: ...Leg assy 4 14 Chart 1 15 Cable clamp large 1 16 Cable clamp small 1 1 17 Screw A 3 x 8 mm 1 18 Screw B 3 x 10 mm 7 19 Screw C 3 x 30 mm 1 1 1 Varies depending on the applicable marketing area 2 Keep t...

Page 4: ...with grounding pin terminal Power supply 120V 16A 220 240V 10A Note This manual provides the illustrations of the accessory parts and machine that may be slightly different in shape from yours In that...

Page 5: ...dy Do not lift the machine by holding the handle Be sure to secure the four handles with the supplied screws B after installation CAUTION Be sure to secure handles If you accidentally hold the handle...

Page 6: ...rm the procedures in How to use the jig slope E 8 How to use the supplied slope 1 Open the shipping box and remove the pack aging materials Note The supplied slope removed in this step is for later us...

Page 7: ...nails into the holes to fix the slope in position Nail Nail 7 Holding the four handles at the right and left of the main body slide the main body down along the slope CAUTION Main body mass approx 160...

Page 8: ...body to the right and left Under this condition remove the fixing materials 3 Pull out the tray 1 and remove the accessory parts Nail 4 Position the slope as illustrated and insert the nails into the...

Page 9: ...an adequate number of per sons When sliding the main body down do not hold onto the scanner portion Do not insert your leg under the slope 8 Removing protective tape packing and other shipping materia...

Page 10: ...equent steps for later use when transporting the machine OK NG 4 Close the right door 5 Slide out the tray 1 6 Remove the protective tape from the tray 1 Note See the User s Guide for instructions on...

Page 11: ...locking screw from the tray 4 13 Remove the four locking screws 14 Attach the three supplied caps 15 Attach the supplied scanner cover One sup plied screw A and one cap 16 Remove the protective sheet...

Page 12: ...king materials 21 Release the lever of the drum unit 22 Slightly slide the drum unit out and remove the protective tape and protective material 23 Slide the drum unit into the main body 24 Lock the dr...

Page 13: ...the color of the label of the toner cartridge is matched with the one of the main body side 4 Push the toner cartridge all the way in Note Make sure that the toner cartridge is pushed all the way in 5...

Page 14: ...duct cover Two supplied screws B Tab 12 Connecting the power cord Note Steps 1 and 2 may be unnecessary depending on the applicable marketing area 1 Connect the connector of the power cord to the mai...

Page 15: ...al number in the same way 4 Touch END 5 Touch Next 16 Unit change Note This function allows the user to select the type of message that will appear when the replacement time arrives for each of the di...

Page 16: ...isalignment conduct the work af ter the step 2 2 Slide out the tray 3 and loosen the 11 indicated screws Screw Screw Screw 3 Move the front cover assy while taking notice of the scale on the cover and...

Page 17: ...Check if there is any position misalignment be tween the front covers of the trays 3 and 4 19 Changing paper size Tray 3 tray 4 Note Perform this procedure only when changing the default paper size In...

Page 18: ...per guide plate rear with the line marked in the bottom of the tray Secure the paper guide plate Four bind screws Note Be sure that the type of screws is correct When changing to A5 insert the paper g...

Page 19: ...y 4 12 Touch System 2 13 Touch LCT Built in Size Settings 14 Touch Tray 3 and select the paper size that was set for the tray 3 15 Touch Tray 4 and select the paper size that was set for the tray 4 16...

Page 20: ...0BaseTX Category5 1000BaseT Category5E Category6 LED2 LED1 Network port 2 Check LEDs for lighting conditions LED1 Should light up steadily if the link network con nection has been made LED2 Should bli...

Page 21: ...6 Touch OK 7 Touch OK on the pop up window 8 Touch twice to return to the HOME screen then touch Maintenance 9 Touch PING TX Address to make the opera tion check of TCP IP 10 Touch the icon on the upp...

Page 22: ...osition 28 Securing the main body 1 Move the main body to the installation site Then lock the two casters at the front to let the main body sit on the floor 2 Attach the four stabilizers supplied leg...

Page 23: ...ont and left At the rear and right 3 Secure four handles of the main body One supplied screw B each CAUTION Be sure to secure handles If you acciden tally hold the handle and lift the machine resultin...

Page 24: ...es or playpens The thin film may cling to nose and mouth and prevent breathing This bag is not a toy 2 Installation procedures 1 Turn OFF the main power switch and unplug the power cord from the power...

Page 25: ...ot inter fere with the roller Connector Rib 10 Reinstall the stamp unit cover 11 Close the original tray 12 Pinch the slot portion at the underside of the lock lever and pull it out Slot 13 Close the...

Reviews: