922-20297011/1.0
93
turning off................................................... 68
turning on ................................................... 57
unpacking standard parts and units ...................... 86
verifying that all cables are properly connected........ 55
verifying that all hardware is properly installed........ 54
verifying that operational power is correct ............. 53
visual inspection of units and transportation boxes
after arrival ................................................ 84
procedures
cables .................................................... 37, 42
formats ...................................................... 76
cable requirements......................................... 49
purpose ........................................................ 7
target audience ............................................... 7
power supply ............................................... 12
Sonar Head ................................................. 13
Sonar Processor ............................................ 12
this manual.................................................... 7
R
cable requirements......................................... 49
this manual.................................................... 7
registered trademarks........................................... 7
repacking
Sonar Head ................................................. 88
not provided with the delivery ........................... 15
cable connections .......................................... 50
cable grounding ............................................ 50
cable installation ........................................... 48
cable terminations ......................................... 50
cables and wiring .......................................... 47
computer .................................................... 80
environmental .............................................. 79
mains power ................................................ 79
physical protection of cables ............................. 49
power ........................................................ 79
radio frequency interference.............................. 49
supply power ............................................... 79
temperature ................................................. 79
cable requirements......................................... 49
Ethernet cable .............................................. 45
safety ........................................................ 17
S
safety rules..................................................... 17
high voltage................................................. 17
basic items .................................................. 14
optional items not provided with the delivery ......... 16
required items not provided with the delivery ......... 15
interface specifications .................................... 74
procedures .................................................. 52
installation .................................................. 61
license ......................................................... 7
version......................................................... 7
testing ....................................................... 65
attaching bracket ........................................... 27
introduction ................................................. 13
mounting .................................................... 29
outline dimensions drawing .............................. 70
overview .................................................... 13
purpose ...................................................... 13
repacking.................................................... 88
testing ....................................................... 63
configuring.................................................. 60
installing .................................................... 23
introduction ................................................. 12
overview .................................................... 12
purpose ...................................................... 12
datagram formats .......................................... 75
synchronization ............................................ 76
Ethernet cable RJ45 ....................................... 45
interface capabilities....................................... 74
mechanical .................................................. 78
performance ................................................ 77
power ........................................................ 79
Seacon MINK-10-CCPL.................................. 46
storage prior to installation ............................... 85
technical..................................................... 73
datagram formats .......................................... 74
provided with the delivery................................ 14
installation of system units ............................... 22
prior to installation ........................................ 85
network adapter ............................................ 62
send us......................................................... 7
installation .................................................. 21
requirements ................................................ 79
support information........................................... 19
supported multiplexers
list ............................................................ 36
Index
Summary of Contents for M3 Sonar FLS
Page 1: ...Installation Manual M3 Sonar FLS Forward Looking Multibeam sonar ...
Page 2: ......
Page 8: ...6 922 20297011 1 0 M3 Sonar FLS ...
Page 72: ...70 922 20297011 1 0 Sonar Head outline dimensions M3 Sonar FLS Installation Manual ...
Page 73: ...922 20297011 1 0 71 Drawing file ...
Page 97: ......
Page 98: ... 2020 Kongsberg Mesotech ...