922-20297011/1.0
53
Making sure that the M3 Sonar FLS is ready
for operational use
Topics
Verifying that the operating power is correct, page 53
Verifying that all hardware is properly installed, page 54
Making sure that all M3 Sonar FLS system cables are properly connected, page 55
Verifying that the operating power is correct
The M3 Sonar FLS operates on AC power from the vessel’s mains supply. Before you apply
AC power to any M3 Sonar FLS unit, you must verify that the voltage is correct.
Prerequisites
Before you can do this task, the following prerequisites must be met:
• All M3 Sonar FLS hardware units have been installed according to the relevant
instructions.
• All system cables have been installed.
• All operating power is available.
• All relevant personnel (ships electrician) and tools (for example a voltmeter) are available.
Procedure
1
For each M3 Sonar FLS unit that operates on AC mains:
a
If necessary, measure the voltage in the mains outlet.
b
Make sure that the relevant M3 Sonar FLS unit can operate on the power provided.
2
Make sure that each circuit breaker on the power circuit can handle the load when
the M3 Sonar FLS is turned on.
3
If applicable, make sure that the power rating of the uninterruptable power supply (UPS)
or true sine wave inverter is capable of supplying enough power to the M3 Sonar FLS.
Summary of Contents for M3 Sonar FLS
Page 1: ...Installation Manual M3 Sonar FLS Forward Looking Multibeam sonar ...
Page 2: ......
Page 8: ...6 922 20297011 1 0 M3 Sonar FLS ...
Page 72: ...70 922 20297011 1 0 Sonar Head outline dimensions M3 Sonar FLS Installation Manual ...
Page 73: ...922 20297011 1 0 71 Drawing file ...
Page 97: ......
Page 98: ... 2020 Kongsberg Mesotech ...