Kongsberg ACS500
Subsea Control Unit
Maintenance on the SCU is mostly changing the battery and checking the seals before
the unit is deployed in water.
SCU maintenance overview
Every time the Subsea Control Unit is taken out of the water
• Clean the unit.
Every time the Subsea Control Unit has been opened
• Test the O-ring by using the interseal test port.
Every year
• Test all O-rings by using the interseal test ports.
Cleaning the Subsea Control Unit
Purpose
This procedure explains how to clean the SCU.
Clean the unit before opening it.
Procedure
1
Use a wooden or plastic scraper or a stiff brush (not wire) to remove shells and
growth.
Be careful not to damage the paint as this leads to corrosion.
2
Ensure that all dirt, slime and growth is removed.
3
Clean the unit thoroughly with lots of fresh water.
4
Dry the unit thoroughly. Dry off any water around the end cap and the vent screw.
5
If the unit is not to be dismounted from the valve package before performing
maintenance, erect a protective cover over the unit to prevent water and dirt coming
inside the unit when the lid is opened.
Opening the Subsea Control Unit
Purpose
This procedure explains how to open the SCU.
Clean and dry the unit thoroughly before opening. Make sure no water or dirt may fall
into the unit from above.
Procedure
1
Remove the six M6 screws.
78
397128/C
Summary of Contents for ACS500
Page 1: ...INSTRUCTION MANUAL ACS500 Acoustic Control System Gisma testport system...
Page 2: ......
Page 15: ...ACS500 System with interface cables 397128 C 13...
Page 38: ...Kongsberg ACS500 ACU Computer buttons on page 37 User interface on page 38 36 397128 C...
Page 71: ...Simulation and test 397128 C 69...
Page 113: ...Drawing file Dunking transducer unit outline dimensions 397128 C 111...
Page 114: ...Kongsberg ACS500 Acoustic Command Unit outline dimensions 112 397128 C...
Page 115: ...Drawing file Subsea Control Unit outline dimensions 397128 C 113...
Page 116: ...Kongsberg ACS500 Subsea Control Unit arrangement 114 397128 C...
Page 117: ...Drawing file Subsea Control Unit bracket 397128 C 115...
Page 118: ...Kongsberg ACS500 TDR30V 34GT Subsea transducer outline dimensions 116 397128 C...
Page 119: ...Drawing file External quad battery unit for SCU outline dimensions 397128 C 117...
Page 120: ...Kongsberg ACS500 Simulator outline dimensions 118 397128 C...
Page 138: ...Kongsberg ACS500 Appendix A Type approval certificate 136 397128 C...
Page 139: ...Appendix A Type approval certificate 397128 C 137...
Page 140: ...Kongsberg ACS500 138 397128 C...
Page 141: ...Appendix A Type approval certificate 397128 C 139...
Page 142: ...Kongsberg ACS500 140 397128 C...
Page 148: ...2016 Kongsberg Maritime...