3
UAB KOMFOVENT we reserve the right to make changes without prior notice
RHP STANDARD_21-04
CONTENT
1.2.1. Integrated heat pump .............................................................................................................................................................................6
1.2.2. Unit types by duct connections ..........................................................................................................................................................9
1.2.3. Unit types by inspection sides .............................................................................................................................................................9
3.1. Requirements for Mounting Location and Installation Base .............................................................................................................14
3.2. Inspection Area .................................................................................................................................................................................................15
3.3. Duct system installation ..................................................................................................................................................................................16
3.4. Connection of external heating/cooling units .......................................................................................................................................18
3.5. Connection of a Condensate Drain .............................................................................................................................................................19
3.6. Outdoor Units .....................................................................................................................................................................................................20
6.1. Requirements for Electrical Connection ..................................................................................................................................................22
6.2. Connection of Electrical Components .......................................................................................................................................................22
6.3. Control Panel Installation ..............................................................................................................................................................................26
6.4. Connecting the Unit to the Internal Computer Network or the Internet .....................................................................................28
8. COMMISSIONING AND INSPECTION OF THE UNIT
8.1. Control panel C5.1 .............................................................................................................................................................................................31
8.2. Starting the Unit With a Computer .............................................................................................................................................................33
8.3. Quick Inspection ................................................................................................................................................................................................35
Summary of Contents for 1300 U
Page 1: ...INSTALLATION MANUAL EN RHP Standard ...
Page 2: ......