35
UAB KOMFOVENT we reserve the right to make changes without prior notice
RHP STANDARD_21-04
You can stop the unit by pressing ON/OFF button in the “Overview” window.
8.3. Quick Inspection
The first time you start your device, make sure that:
Task
Yes
No
Comments
Control panel is working,
responds to touch, no error
messages
All air filters are installed
Air dampers fully open
There are no unusual noise or
vibrations
Changing the ventilation modes
changes the fan speed
The unit is airtight without gaps
or air leakage
Heating/cooling devices are
working
Connected external devices are
working
The condensate easily flows from
the unit and the drainage piping
is watertight
Check for leaks in the heat pump
piping system
Check if there is no mois-ture in
the refrigerant sys-tem
The heat pump compressor
operates properly, without any
extraneous noise and vibrations.
Other comments:
Installer
Company
Tel. No.
Date
Signature
Summary of Contents for 1300 U
Page 1: ...INSTALLATION MANUAL EN RHP Standard ...
Page 2: ......