.
ATTACHMENTS, OPTIONS
EFFECTIVE METHOD OF OPERATION FOR DUAL TILTDOZER
S PITCH (STANDARD)
Normal operations
Applicable operation
Normal operations
F PITCH (PITCH DUMP)
Keep the pitch button pushed in and operate the right tilt.
Applicable operation
Digging natural ground and bed-rock (digging hard soil)
Pushing soil over cliffs
Pushing-up soil
(Reduces spillage of soil over the top surface of the blade, and
reduces amount of soil carried back)
6 - 14
Summary of Contents for D475A-5E0
Page 2: ... 1 1 ...
Page 14: ... 2 1 ...
Page 53: ... ...
Page 54: ... 3 1 ...
Page 243: ... ...
Page 244: ... 4 1 ...
Page 301: ... MAINTENANCE SERVICE PROCEDURE MAINTENANCE SERVICE PROCEDURE A Right of machine 4 58 ...
Page 338: ... 5 1 ...
Page 340: ... 6 1 ...
Page 401: ... ...