.
SAFETY
SAFETY
PRECAUTIONS FOR OPERATION
2- 18
PRECAUTIONS FOR JOBSITE
2- 18
INVESTIGATE AND CONFIRM JOBSITE CONDITIONS
2- 18
WORKING ON LOOSE GROUND
2- 18
DO NOT GO CLOSE TO HIGH-VOLTAGE CABLES
2- 19
ENSURE GOOD VISIBILITY
2- 19
CHECKING SIGNS AND SIGNALMAN'S SIGNALS
2- 20
BEWARE OF ASBESTOS DUST
2- 20
STARTING ENGINE
2- 20
USE WARNING TAGS
2- 20
INSPECTION AND MAINTENANCE BEFORE STARTING ENGINE
2- 21
PRECAUTIONS WHEN STARTING ENGINE
2- 21
PRECAUTIONS IN COLD AREAS
2- 21
STARTING WITH BOOSTER CABLES
2- 22
OPERATION
2- 23
CHECKS BEFORE OPERATION
2- 23
PRECAUTIONS WHEN TRAVELING IN FORWARD OR REVERSE
2- 23
PRECAUTIONS WHEN TRAVELING
2- 24
TRAVELING ON SLOPES
2- 24
PRECAUTIONS WHEN OPERATING
2- 25
PROHIBITED OPERATIONS
2- 25
METHOD OF USING BRAKES
2- 25
TRAVELING ON SNOW-COVERED OR FROZEN SURFACES
2- 25
PARKING MACHINE
2- 26
TRANSPORTATION
2- 27
LOADING AND UNLOADING
2- 27
TOWING
2- 28
PRECAUTIONS WHEN TOWING
2- 28
2 - 3
Summary of Contents for D475A-5E0
Page 2: ... 1 1 ...
Page 14: ... 2 1 ...
Page 53: ... ...
Page 54: ... 3 1 ...
Page 243: ... ...
Page 244: ... 4 1 ...
Page 301: ... MAINTENANCE SERVICE PROCEDURE MAINTENANCE SERVICE PROCEDURE A Right of machine 4 58 ...
Page 338: ... 5 1 ...
Page 340: ... 6 1 ...
Page 401: ... ...