Functionality tests 29
AZURA® Conductivity Monitor CM 2.1S Instructions, V6710
Process
Figure
1.
Set the on/off switch on the
power supply to the OFF
1
posi tion.
1
The display and the LED on the power supply go off.
Disconnect the power supply from the mains power connection.
6. Functionality tests
Note:
Standard processes in single devices may be handeled differently
in indi vidual cases.
The customer may request the Installation Qualification, which is free of
charge. In case of a request, the technical support of KNAUER or from a
provider autho rized by KNAUER performs this functionality test during
the installation.
The Installation Qualification is a standardized document that comes as
part of the delivery and includes the following:
Confirmation of flawless condition at delivery
Check if the delivery is complete
Certification on the functionality of the device
The Operation Qualification includes an extensive functionality test accor-
ding to KNAUER standard OQ documents. The Operation Qualification is
a standard ized document and free of charge. It is not part of the delivery,
please contact the technical support in case of request.
The Operation Qualification includes the following:
Definition of customer requirements and acceptance terms
Documentation on device specifications
Device functionality check at installation site
To make sure that the device operates within the specified range, you
should test the device regularly. The test intervals are dependent on the
usage of the device.
The test can be carried out either by the technical support of KNAUER or
from a provider authorized by KNAUER (for a fee).
Result
Next steps
Installation
Qualification (IQ)
Operation
Qualification (OQ)
Test intervals
Execution