Operation 21
AZURA® Conductivity Monitor CM 2.1S Instructions, V6710
Process
Figure
1.
Set the on/off switch
1
to the
OFF position
2.
Connect the power supply to
the device and afterwards plug
the power plug into the socket.
1
Set the on/off switch to the ON position and start up the device.
5. Operation
The device is operated via the membrane keypad. The measurement can
be followed via software, (e.g. PurityChrom® or ClarityChrom®), on the
display or via the analog signal.
5.1 Initial start-up
In case the monitor is part of a FPLC/HPLC system, check for the following
crite ria:
A connection to the computer via the desired interface has been esta-
blished (see chapter 4.4 on page 16).
The software has been installed.
The CM flow cell and optionally the pH monitor have been installed
5.2 Switch on
The device has been installed at a suitable site.
The device has been connected to power mains connection.
The installation has been completed.
Process
Figure
1.
Set the on/off switch
1
to the
ON position.
1
The display lights up and the green LED on the power supply indicates
that the device is supplied with power.
Next steps
Prerequisites
Result