DAD 6.1L/DAD 2.1L/MWD 2.1L user manual V6700, version 3.2
Installation
17
Next steps
Attach the front cover.
Control
The detector can be operated in two ways:
via remote connector
as part of a LAN, via the LAN connector of the router
All connectors for external control are located on the rear side of the detec-
tor.
The detector can also be controlled via Control Unit or Mobile Control. The
Control Unit connector is located on the side of the device.
3. Connect the nozzle and the fun-
nel.
4. Push the other end of the hose
onto the nozzle
5
of the leak
tray.
Fig. 14
Hose connected to device
5. For the bottom device, push the
short end of the nozzle
6
into
the opening in the collection
point of the leak tray.
6. Connect the hose to the nozzle
and lead the second ending to
the waste bottle.
7. Place the waste bottle below the
bottom device.
Fig. 15
Leak tray with nozzle
Process
Process
Figure
5
6
Legend
1
integrator outlets
2
LAN connector
3
service interface
4
multi-pin connector
Fig. 16
connectors on rear side
1
4
2 3