![Kirby Morgan 37SS Operation And Maintenance Manual Download Page 120](http://html1.mh-extra.com/html/kirby-morgan/37ss/37ss_operation-and-maintenance-manual_1971883120.webp)
106
© ⅯⅯⅩⅢ Kirby Morgan Dive Systems, Inc. All rights reserved. Document # 130318002
Chapter 7 - Reassembly of the SuperFlow® 350 Demand Regulator
Kirby Morgan
®
37SS
Insert the regulator into the pod.
Carefully tighten the tie wrap, making sure it is
completely in the grove. Trim the tie wrap as close
as possible. Check for good fit.
Carefully tighten tie wrap.
Inspect the regulator mount nut for contamination and
damage. Use a tooth brush to clean threads as needed.
Lightly lubricate and install the sealing O-ring and
thread on the regulator mount nut.
The port and starboard whiskers should align with the
whisker covering the main body so that the mold lines are in
alignment. You can also make marks on the whiskers with a
felt tip pen.
21) Carefully inspect the bent tube for damage and
contamination. The bent tube must be free of dents
and compressions deeper than
1/8"
and should not have
deep scratches or sever corrosion. Replace the bent
tube if questionable. Install the bent tube assembly
before tightening the regulator mount nut, finger tight
NOTE: If this maintenance is during an annual
overhaul, replace the Teflon
®
ring at the side block
end of the bent tube and the O-ring at the demand
regulator inlet side of the bent tube.
Lightly lubricate the O-ring on the bent tube assem
-
bly. Slide the O-ring end of the bent tube assembly
into the regulator inlet nipple until the side block end
is aligned with the threads for the bent tube mount
nut. Rotating clockwise, thread the large nut on the
bent tube assembly onto the inlet nipple 1 to 2 threads.