![Kikusui PLZ-3WH Series Operation Manual Download Page 87](http://html.mh-extra.com/html/kikusui/plz-3wh-series/plz-3wh-series_operation-manual_1966748087.webp)
4-47
Chapter 4: Operating Procedure
4.6
External Control
The rear panel of the PLZ-3WH series electronic load unit is equipped with external control connectors J1 and J2
(hereinafter referred to as simply “J1” and “J2”). When other devices are connected to these connectors, you can
operate the load unit or check its status externally. Generally, J1 is used as an output terminal and J2 as an input
terminal.
J1 and J2 are MIL-type standard 16 P connectors. Since these connectors are equipped with a lock lever, they are both
reliable and easy to connect/disconnect. The table and figure below show the functions and terminal arrangement of
these connectors.
Table 4.6-1
J1 connector
Terminal number
J2 connector
NC
1
Short output (+)
NC
2
Short output (-)
Trigger signal output (+)
3
Trigger signal input (+)
Trigger signal output (-)
4
Trigger signal input (-), D. COM
Load on/off monitor output (+)
5
Load on/off input (+)
Load on/off monitor output (-)
6
Load on/off input (-)
NC
7
CC/CR voltage control
A.COM
8
A. COM
Slave output
9
Slave input
Current SUM input
10
Current SUM output
NC
11
External resistance control (+)
NC
12
External resistance control (-)
NC
13
CP voltage control
D.COM
14
Alarm output (-)
NC
15
Range select
Alarm input
16
Alarm output (+)
NOTE
The trigger signal output terminals are internally connected to the TRIG OUT terminals on the bottom
left of the subpanel.
Fig. 4.6-1
J2
J1
(Rear panel)
1
2
16
1
2
16
External Control Connectors
Summary of Contents for PLZ-3WH Series
Page 3: ......
Page 4: ......
Page 5: ......
Page 6: ......
Page 7: ......
Page 8: ......
Page 10: ......
Page 11: ......
Page 14: ......
Page 15: ......
Page 16: ......
Page 17: ......
Page 18: ......
Page 19: ......
Page 20: ......
Page 21: ......
Page 22: ......
Page 23: ......
Page 24: ......
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 33: ......
Page 35: ......
Page 36: ......
Page 39: ......
Page 40: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 66: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 80: ......
Page 81: ......
Page 84: ......
Page 100: ...Chapter 4 Operating Procedure 4 60 ...
Page 101: ......
Page 102: ......
Page 103: ......
Page 105: ......
Page 106: ......
Page 107: ......
Page 108: ......
Page 109: ......
Page 112: ......
Page 114: ......
Page 115: ......
Page 116: ......
Page 118: ......
Page 123: ......
Page 125: ......
Page 126: ......
Page 127: ......
Page 129: ......
Page 130: ......
Page 131: ......
Page 132: ......
Page 133: ......
Page 134: ......
Page 136: ......
Page 137: ......
Page 138: ......
Page 139: ......
Page 140: ......
Page 141: ......
Page 142: ......
Page 143: ......
Page 144: ......
Page 145: ......
Page 146: ......
Page 147: ......
Page 148: ......
Page 149: ......
Page 153: ......
Page 156: ......
Page 157: ......
Page 158: ......
Page 159: ......
Page 161: ......
Page 162: ......
Page 163: ......
Page 164: ......
Page 165: ......
Page 166: ......
Page 167: ......
Page 168: ......
Page 172: ...I 4 Index ...