39
Stakes Prep
SHEET 3 OF 3
REV.
A
DWG. NO.
SIZE
WEIGHT:
SCALE:1:50
Warning!
To prevent tipping and avoid potential injury, stakes
must be driven 13” (330 mm) into ground. Digging or driving stakes can
be dangerous if you do not check first for under-ground wiring, cables
or gas lines.
A:
In the 5 places shown in fig. 10.1 drive the Rebar Ground Stakes 13” (330 mm) into the ground against outside
front corner of the End Wall, on both (2607) Diagonals and both (2613) Heavy SW Posts. Be careful not to hit the
washer while hammering stakes into the ground as this could cause the washer to break off.
B:
Attach ground stakes using 1 (S7) Pan Screw per ground stake (fig. 10.2 and 10.3).
C:
After driving stakes into the ground, check for sharp edges caused by the impact of the hammer. Smooth any
sharp edges from impact area and touch up with outdoor paint.
Step 10: Install Ground Stakes
MOVE FORT TO FINAL LOCATION PRIOR TO STAKING
FINAL LOCATION MUST BE LEVEL GROUND
Hardware
5 x
Pan Screw
5 x Rebar Ground Stake
Other Parts
SEE FRONT COVER
FOR SAFETY CLEARANCE
Rebar
Ground
Stake
13” (330 mm)
In Ground
S7
Fig. 10.1
Fig. 10.2
Fig. 10.3
2607
S7
2613
2607
S7
13” (330 mm)
In Ground
Rebar
Ground
Stake
Front
End
Wall
End Wall