
64
Fig. 27.13
E:
On the Back of the fort measure 21-5/8” (549 mm) from (2759) Roof End and 1-1/4” (32 mm) down from the top
of (2677) Narrow Panel, pre-drill with a 3/16” (4.8 mm) drill bit then place 1 (2684) Mid Roof End centred over the
pilot hole and flush to the top of (2677) Narrow Panel attach from the inside with 1 (S4) Wood Screw and from the
outside with 1 (S3) Wood Screws. (fig. 27.12 and 27.13)
F:
On the Front of the fort measure 21-5/8” (549 mm) from (2759) Roof End and 1-1/4” (32 mm) down from the top
of the panel, pre-drill with a 3/16” (4.8 mm) drill bit then place 1 (2684) Mid Roof End centred over the pilot hole and
flush to the top of the (2677) Narrow Panel and attach from the inside with 1 (S4) Wood Screw and from the outside
with 1 (S3) Wood Screws. (fig. 27.12 and 27.14)
Step 27: Attach Roof Ends
Part 5
Flush
Flush
Back Wall
Fig. 27.14
2677
2759
2759
2759
Swing Wall
Fig. 27.12
2684
2684
2677
2677
2684
2759
Flush
Flush
Front Wall
Hardware
2 x
Mid Roof End
Wood Parts
2684
2 x
Wood Screw
2 x
Wood Screw
S3
S4
S3
S3
S4
S4
2677
2684
21-5/8”
21-5/8”
Front
Wall
Back
Wall
End Wall
(549 mm)
(549 mm)