26
Keysight PD1000A Test Fixture Operating Guide
Test Fixture Calibration
15
Insert the Port 2
50
Ω
LOAD
Cal Standard into the test fixture. The
50
Ω
LOAD
Cal Standard goes between the Gate and Drain/Collector. Click
Measure
.
16
Insert the
THROUGH
Calibration Standard into the Test Fixture. Click
Measure.
17
In this screen, the display shows the calculated delay through the
THROUGH
Cal Standard. Ensure that the displayed value is less than 0.2 nS. Click
OK
.
18
Click
Save As User CalSet
. Click
Finish
to complete the calibration procedure.
19
Remove the Calibration Standard from the Test Fixture.
Summary of Contents for PD1000A
Page 2: ......
Page 6: ...vi ...
Page 8: ...viii Keysight PD1000A Test Fixture Operating Guide ...
Page 43: ......