18
Chapter 2
Operation
Performing Open and Short Correction
Performing Open Correction
The open correction procedure is as follows.
1. Push the HIGH side contact pin so that the distance between the HIGH and the LOW
contact pins matches the DUT’s width (
Figure 2-3
).
It is recommended that you place the DUT on the measuring stage and precisely
position the HIGH side contact pin to actual DUT width.
2. Tighten the contact pin locking screw to secure the HIGH side contact pin.
Figure 2-3
Contact pin position for open correction
3. Perform the open correction as described in the specific instrument’s manual.
Before performing open correction, remove the DUT used for positioning by pulling
back the lever to release the LOW side contact pin.
Summary of Contents for 16034G
Page 1: ...Keysight 16034G Test Fixture Operation Manual...
Page 2: ......
Page 3: ...3...
Page 8: ...8...
Page 10: ...10 Contents...
Page 11: ...1 Overview...