16
Chapter 2
Operation
Performing Open and Short Correction
Performing Open and Short
Correction
To enhance measurement accuracy, open and short correction should be done before DUT
measurement. The following procedure shows correction and measurement by the 16034G.
Connecting the 16034G
1. Set the cable length to 0 m in the instrument.
2. Connect the 16034G directly to the UNKNOWN terminals as shown in
Figure 2-1
.
Figure 2-1
Connecting the 16034G
Take care to avoid rough handling and never allow any mechanical shock to the 16034G,
especially against the contact pins from the sides or any to the parts mounted on top of
the fixture.
Summary of Contents for 16034G
Page 1: ...Keysight 16034G Test Fixture Operation Manual...
Page 2: ......
Page 3: ...3...
Page 8: ...8...
Page 10: ...10 Contents...
Page 11: ...1 Overview...