Fuel feed cycle
- auger operation cycle includes fuel feeding and feeding pause.
This parameter specifies the time of the whole cycle. The desired value specifies all
burner work modes which require fuel feeding (ignition, maximum and minimum
power).
F U E L
F E E D
C Y C L E
1 5 s
Fuel feed during ignition
- this parameter specifies fuel dose that is fed to the
burner during lighter operation. The programmed setting specifies feeding time in
percent in relation to the time of whole work cycle. Selection of „0s” setting will
switch fuel feeding during operation of the lighter. In this case „Initial Fuel Dose”
setting be shall be programmed as the value over „0s”.
F U E L
D O S E D U R I N G
I G N I T I O N
2 0 %
Fuel feed for max. burner power
- this parameter specifies fuel dose fed to the
burner during operation with maximum power. The programmed setting specifies
feeding time in percent in relation to the time of whole work cycle.
F U E L
D O S E
F O R
M A X
P O W E R
5 0 %
Fuel feed for min. burner power
- this parameter specifies fuel dose fed to the
burner during operation with minimum power. The programmed setting specifies
feeding time in percent in relation to the time of whole work cycle.
F U E L
D O S E
F O R
M I N P O W E R
2 0 %
Stoker work mode
- this parameter specifies work mode of the stoker:
-
„OFF”
- the burner without the stoker.
-
„CYCL.”
- stoker is switched on periodically, regardless of the auger. Work
and pause time of the stoker is determined with particular settings.
-
„AUTO”
- operation mode when the stoke is switched on along with the
auger and is switched off with a delay defined with „Stoker extra work time” setting.
S T O K E R W O R K
M O D E
A U T O
Stoker work time
- this parameter specifies operation time of the stoker in whole
work cycle. This setting is unavailable if the stoker is switched off or in automatic
mode.
S T O K E R W O R K
T I M E
3 s