22
CL I Test Flow
Press CLI to start a test.
Short press: 1 sec of continuity test
Long press: 5 sec of continuity test
Continuity test
DUT ON Check
0.11 -
0.88Ω = tAbL
Stand-by
state
Press to proceed to the next;
continuity test is regarded as
PASS.
Rpe>0.88Ω = FAIL
Rpe>0.11Ω =PASS
2.
Ins
u
lat
ion
r
es
is
tan
c
e
tes
t
1.
Cont
inu
ity
te
s
t
DUT is ON.
DUT is OFF.
Voltage value is displayed
while the Tester is connected
to an outlet.
Press
to halt a
measurement in
process.
Tester performs next
test when CL I switch
is pressed while a test
is hal
ted with “FAIL”
indication.
DUT is powered on, or
CL I is pressed.
Insulation resistance test